NEA Power Task Force Election 2019 formed
The National Electrification Administration (NEA) has created a task force that will ensure the adequate…
Scheduled Power Interruption in AREA 1 (Naval Area) AREA 2 (Biliran, Cabucgayan & Caibiran Area) AREA 3 (Almeria, Culaba & Kawayan Area)
*Please be advised that a maximum of FOUR HOURS (4-HRs) power interruption will be experienced…
BILECO participates in nationwide earthquake drill
Some BILECO personnel actively participated during the first quarter Nationwide Simultaneous Earthquake Drill (NSED) 2019…
MSEAC expresses support to APEC partylist
BILECO held its first quarter MSEAC Meeting this February where all of its members manifested…
BILECO personnel wears black on valentines day
BILECO joined the rest of electric cooperatives in the country in celebrating the black valentines…
BILECO holds blessing, testing of Higatangan microgrid system
BILECO successfully held the blessing and the testing and commissioning of Higatangan Microgrid System at…
FEBRUARY 2019 Effective Rates
February 2019 Effective Rates: Residential: P11.0367/kwH Commercial: P9.4342/kwH Public Building: P9.4342/kwH Street Light: P9.4342/kwH Effective…
Scheduled Power Interruption in AREA 1 (Naval Area) AREA 2 (Biliran, Cabucgayan & Caibiran Area) AREA 3 (Almeria, Culaba & Kawayan Area) on February 12, 13 & 14, 2019
*Please be advised that a maximum of TEN HOURS (10-HRs) power interruption will be experienced…
- Go to the previous page
- 1
- …
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- …
- 51
- Go to the next page