Scheduled Power Interruption in AREA 1 (Naval Area), AREA 2 (Biliran, Cabucgayan and Caibiran Area) and AREA 3 (Almeria, Kawayan and Culaba Area)
*Please be advised that a maximum of FOUR HOURS (4-HRs) power interruption will be experienced…
*Please be advised that a maximum of FOUR HOURS (4-HRs) power interruption will be experienced…
April 2020 Effective Rates: Residential: P8.5943/kwH Commercial: P7.3018/kwH Public Building: P7.3018/kwH Street Light: P7.3018/kwH Effective…
March 2020 Effective Rates: Residential: P9.0807/kwH Commercial: P7.7504/kwH Public Building: P7.7504/kwH Street Light: P7.7504/kwH Effective…
February 2020 Effective Rates: Residential: P8.8711/kwH Commercial: P7.6981/kwH Public Building: P7.6981/kwH Street Light: P7.6981/kwH Effective…
IFB BILECO No. NHA 2019-003 (Rebidding) Invitation for bids for the supply and delivery of…
January 2020 Effective Rates: Residential: P8.6189/kwH Commercial: P7.3520/kwH Public Building: P7.3520/kwH Street Light: P7.3520/kwH Effective…